Braun Road FM 1604 to FM 1560

image56
image57

Braun Road FM 1604 to FM 1560

San Antonio, Texas
Client: Bexar County

Located within the Helotes Creek watersheds, this project included drainage design (in compliance with the 100-year storm requirements) and street reconstruction for approximately 9,000 linear feet of street. In addition to the drainage structure replacement three additional drainage structures were designed and constructed. The side ditch grades were adjusted to match the new drainage structures and the reconstructed street. The driveways and side streets had ditch culverts installed.