Turtle Creek No. 3 Sewer Line Relocation

image17
image16

Turtle Creek No. 3 Sewer Line Relocation

San Antonio, Texas
Client: San Antonio Water System (SAWS)

This project was part of the 2017 Production Facilities Design Engineering Work Order Contract. The purpose of this project was to relocate a 10-inch sanitary sewer that bisected the proposed Turtle Creek Pump Station site. This would allow for construction of the proposed Turtle Creek Pump Station without having to deal with an existing sewer main running down the middle of the site. The existing sewer was relocated to the eastern perimeter of the site. The overall length of the sewer main was 1,364-feet in length and included nine new manholes.